The Choras Cost-Plus Methodology
Experience a structured, four-phase cost-plus construction process designed to eliminate financial ambiguity and maintain technical integrity at every stage of your project.

Initial Consultation
Every renovation begins with understanding the people behind the project. We take the time to meet with you, listen to your ideas, and understand what you want to accomplish, what matters most, and what your expectations are.
We’ll walk through your home together, discuss the proposed work, and look at the existing conditions that may influence the project. This includes identifying potential structural considerations, moisture concerns, and any building code requirements that may need attention.
We’ll share our experience, offer honest feedback, and discuss a preliminary budget range so you have a realistic starting point. We’ll also explain how our approach to project costs and management works, so you know exactly what to expect.
There is no pressure or obligation to proceed. Our goal is to make sure you have the information and confidence to decide whether Choras Construction is the right fit for your project.
Planning & Permitting
Once we’ve agreed to move forward, we schedule an on-site measuring appointment to gather the information needed for professionally prepared architectural and engineering drawings through our established partners.
The applicable measuring, drawing, and professional fees are outlined and approved before proceeding. These drawings form the foundation for accurate project planning, allowing us to develop a detailed construction budget based on actual quantities, materials, labour, and trade requirements.
Detailed Budget & Project Agreement
With the drawings complete, we prepare a detailed construction budget, organized by project stage and outlining the anticipated build costs. Once the scope, budget, and management fee are reviewed and agreed upon, we finalize the renovation agreement.
From there, Choras coordinates the municipal permit application process and works with the appropriate professionals and municipal departments to secure the required approvals before construction begins.


Active On-Site Management
Regular oversight ensures that all trades—from plumbing to framing—are guided according to the specific project vision. Technical accountability is maintained at every stage, focusing on the quality of work behind the walls.
We act as the lead advocate for the homeowner, managing subcontractor schedules and quality control in real-time to resolve issues before they escalate.
Pre-Boarding Walkthrough
Before any drywall goes up, we walk the space with you. This is your opportunity to see everything behind the walls: the framing, rough plumbing, electrical runs, and insulation, all while changes are still straightforward to make. If something needs adjusting, this is the right time. Once the boards go up, that window closes.
04.

Handover & Quality Assurance
The final phase is dedicated to a rigorous quality audit designed to ensure that the “big reveal” is never a surprise, but rather the natural conclusion of a transparent process.
A project is only considered complete once all technical requirements are satisfied and, more importantly, we have ensured that your specific needs are met and you are genuinely happy with the result. Upon handover, we provide documentation and maintenance guidance to ensure a smooth transition back to the homeowner.
FISCAL TRANSPARENCY
A Comparison of Construction Models
Most homeowners are accustomed to the “fixed-price” or “price-per-square-foot” estimate. While these models appear simple, they often contain hidden layers of risk mitigation that favor the contractor rather than the client. Choras Construction operates on a Cost-Plus model to align the project’s financial interests with the homeowner’s goals.
| Feature | Fixed-Price / Price Per Foot | The Choras Cost-Plus Model |
|---|---|---|
| Budgeting | Costs are bundled into a single, opaque number based on broad assumptions. | Costs are broken down line-by-line based on actual quotes and material prices. |
| Risk Management | Contractors include “risk buffers” (padded margins) to protect against unknowns. | Clients pay only for the actual labor and materials required; no padded buffers. |
| Change Orders | Any adjustment to scope usually triggers heavy fees and high markups. | Scope changes are processed at the actual cost of the new trade work or materials. |
| Material Choices | Often restricted to “builder grade” to protect the contractor’s profit margin. | Full freedom to select any material at its true market price with zero markups. |
| Project Interest | Contractor is incentivized to finish quickly and use cheaper resources to save margin. | The manager is incentivized to prioritize quality and technical integrity for a flat fee. |